Availability: | |
---|---|
Quantity: | |
▶ Product Introduction
In the context of construction lifts or construction hoists, the transmission unit is a critical component that facilitates the vertical movement of the lift platform. The transmission unit is responsible for transmitting power from the motor to the hoisting mechanism, enabling the controlled lifting and lowering of the construction elevator.
▶ Product Advantage
1. The transmission unit is designed to handle the specific load capacity of the construction lift. It is strong enough to lift heavy objects safely.
2. The efficiency of the transmission unit is crucial for minimizing energy losses during power transmission. Efficient transmission contributes to the overall energy efficiency of the construction lift.
3. The components in the transmission are made of durable materials and can withstand the requirements of continuous operation on the construction site.
4. A well-designed transmission unit should facilitate easy maintenance, allowing for inspections, lubrication, and necessary repairs without excessive downtime.
5. The transmission unit should provide smooth and controlled operation to ensure the comfort and safety of passengers and workers using the construction lift.
▶ Product Uses
Construction Hoist Gearbox Reducer is suitable for construction elevators.
▶ Product Introduction
In the context of construction lifts or construction hoists, the transmission unit is a critical component that facilitates the vertical movement of the lift platform. The transmission unit is responsible for transmitting power from the motor to the hoisting mechanism, enabling the controlled lifting and lowering of the construction elevator.
▶ Product Advantage
1. The transmission unit is designed to handle the specific load capacity of the construction lift. It is strong enough to lift heavy objects safely.
2. The efficiency of the transmission unit is crucial for minimizing energy losses during power transmission. Efficient transmission contributes to the overall energy efficiency of the construction lift.
3. The components in the transmission are made of durable materials and can withstand the requirements of continuous operation on the construction site.
4. A well-designed transmission unit should facilitate easy maintenance, allowing for inspections, lubrication, and necessary repairs without excessive downtime.
5. The transmission unit should provide smooth and controlled operation to ensure the comfort and safety of passengers and workers using the construction lift.
▶ Product Uses
Construction Hoist Gearbox Reducer is suitable for construction elevators.
Product name | Construction Passenger Hoist Drive Mechanism XX77 | |||||||||
Usage | Drive construction hoist | |||||||||
Color | Silver/blue/gray | |||||||||
Size | (900)mm×237mm×225mm | |||||||||
Application | Construction hoist/building hoist | |||||||||
Elevator lifting speed | 0-26m/min,0-33m/min | |||||||||
After Warranty Service | Online support | |||||||||
After-sales Service Provided | Online support,No overseas service provided | |||||||||
Certification | ISO | |||||||||
Product model | Product name | Transmission ratio(i) | Motor power(kw) | Motor input speed(r/min) | Transmisson efficiency(%) | Lifting weight of a set of drive units(kg) | Number of transmission units(set) | Lifting speed(m/min) | ||
XX77-16-13 | Construction Passenger Hoist Drive Mechanism XX77 | 16 | 13、15 13、15 13、15 | 1400 | ≥95 | 818 | 1390 | 2 | 33 | |
XX77-20-13 | 20 | 1010 | 1717 | 1 | 27 | |||||
XX87-16-13 | 16 | 960 | 1632 | 2 | 33 | |||||
XX87-20-13 | 20 | 13、15 | 1276 | 2170 | 1 | 27 | ||||
XX87-16- HZ87 | 16 (Medium high speed) | 11/19 | 1460-2520 | ≥95 | 1090 | 1853 | 3 | 0-62 | ||
XX87-22- HZ87 | 22 (low speed) | 11/19 | 1460-2520 | ≥95 | 1558 | 2649 | 2 | 0-43 |
Product name | Construction Passenger Hoist Drive Mechanism XX77 | |||||||||
Usage | Drive construction hoist | |||||||||
Color | Silver/blue/gray | |||||||||
Size | (900)mm×237mm×225mm | |||||||||
Application | Construction hoist/building hoist | |||||||||
Elevator lifting speed | 0-26m/min,0-33m/min | |||||||||
After Warranty Service | Online support | |||||||||
After-sales Service Provided | Online support,No overseas service provided | |||||||||
Certification | ISO | |||||||||
Product model | Product name | Transmission ratio(i) | Motor power(kw) | Motor input speed(r/min) | Transmisson efficiency(%) | Lifting weight of a set of drive units(kg) | Number of transmission units(set) | Lifting speed(m/min) | ||
XX77-16-13 | Construction Passenger Hoist Drive Mechanism XX77 | 16 | 13、15 13、15 13、15 | 1400 | ≥95 | 818 | 1390 | 2 | 33 | |
XX77-20-13 | 20 | 1010 | 1717 | 1 | 27 | |||||
XX87-16-13 | 16 | 960 | 1632 | 2 | 33 | |||||
XX87-20-13 | 20 | 13、15 | 1276 | 2170 | 1 | 27 | ||||
XX87-16- HZ87 | 16 (Medium high speed) | 11/19 | 1460-2520 | ≥95 | 1090 | 1853 | 3 | 0-62 | ||
XX87-22- HZ87 | 22 (low speed) | 11/19 | 1460-2520 | ≥95 | 1558 | 2649 | 2 | 0-43 |
Q1: How long is your delivery time?
A1: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q2: What can you buy from us?
A2: TOWER CRANE,TCW WORM GEAR REDUCER,SAFETY DEVICE,
CONSTRUCTION HOIST,HYDRAULIC ELEVATOR,CRANE TOEWER,ETC.
Q3: How can we guarantee quality?
A3: Always a pre-production sample before mass production;Always final Inspection before shipment.
Q4: Why choose us?
A4: First,we focus on the highest quality and service, ;Second,we have 20 years of industry experience, so we are very professional.
Q5: What are your terms of packing?
A5: Big parts wrapped with plastic films and fixed in container.Small parts in paper cartons or wooden boxes. For delivery in LCL,all will be packed in wooden crates.
Q1: How long is your delivery time?
A1: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q2: What can you buy from us?
A2: TOWER CRANE,TCW WORM GEAR REDUCER,SAFETY DEVICE,
CONSTRUCTION HOIST,HYDRAULIC ELEVATOR,CRANE TOEWER,ETC.
Q3: How can we guarantee quality?
A3: Always a pre-production sample before mass production;Always final Inspection before shipment.
Q4: Why choose us?
A4: First,we focus on the highest quality and service, ;Second,we have 20 years of industry experience, so we are very professional.
Q5: What are your terms of packing?
A5: Big parts wrapped with plastic films and fixed in container.Small parts in paper cartons or wooden boxes. For delivery in LCL,all will be packed in wooden crates.